3. More base work

My design was to place carriage bolts down through the floor, beams, undercoat and through the holes in HF trailer beams.  Split washers, then wingnuts will keep it connected.

I had to drill one layer at a time and then align them all.  You see the floor being glued to the floorbeams.IMG_4406

IMG_4407

Both parts are drying.  I added the 14 gauge wire through the floor beams for the floor outlets to be.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s